  • 2016-2017 Construction Project
    Finished in 2017

     

     

    1/2 mile of 8-inch water line along Brush Creek Rd between Lone Chimney and Glencoe Rd.

    1/2 mile of 8-inch water line along Airport Rd between Brush Creek Rd Jardot Rd.

    1 mile of 8-inch water line along Airport Rd between Brush Creek Rd and Fairgrounds Rd.

    1 mile of 8-inch water line along Fairgrounds Rd between McElroy Rd and Lakeview Rd.

    1 mile of 8-inch water line along Fairground Rd between 32nd St and 44th St.

    1/2 mile of 8-inch water line along Jardot St between Burris Rd and Richmond Rd.

    1 mile of 8-inch water line along Jardot St between Richmond Rd and Airport Rd.

    These projects will replace 6 miles of old, smaller water lines.  It will also add 9 fill hydrants and complete 1 loop feed.  The original lines in our system are over 40 years old and beginning to fail.  In our thirty year plan, we will be replacing the old lines and installing new lines in areas where they are needed.  We are replacing all 2 and 2 1/2-inch lines with 6 or 8-inch lines

  • Hwy 108 Tower
    2017

    We are planning to repair and rehabilitate the water tower on hwy 108 to return it to service.  This will help provide consistant and steady water pressure, plus, it will supply storage for an emergency. 

  • Radio Meter Reading System
    2019

    We have been working on this for some time now, but there are many steps to getting the radio reading system in place.  This will make for more accurate and reliable meter readings that will also provide enhanced benefits, such as slow leak notifications sent to the office so we may alert the member(s).

  • Long Term Goals
    Continued
    • We are planning to continue to upgrade and replace older, smaller lines.
    • Add additional towers to support all areas of our system and reduce the load and reliance on the pump stations.
    • Where feasible, complete loop feeds to enhance water quality and flow throughout the system.